Day: April 25, 2024

Premium modular house manufacturer

Prefabricated house supplier right now: Installation Efficiency – Flat-packed container house: The quick installation process ensures shorter construction times. A team of four workers can complete the installation of a single modular house in just 3 hours. Alternatively, the houses can be transported in full containers and connected to water and electricity on-site for immediate use. Light steel movable plank building: The installation process is time-consuming, taking 20-30 days, including pouring concrete foundations, constructing the main body, installing color steel plates, suspending the ceiling, and installing water and electricity. This method poses a high risk of operation and labor loss. See extra information on container house China.

Container house is designed and developed according to the standard size of shipping container. It is of heatproof and waterproof. It is widely used as office, meeting room, dormitory, shop, booth, toilet, storage, kitchen, shower room and so on. Lida Flat Pack Container House is steel-frame structure, consisted with roofing frame, corner pillar and floor frame. All parts are prefabricated in factory and installed in site. Based on modular standard container house, container house can be grouped in horizontal and vertical. Flexible in layout and prefabricated to achieve different function purpose.

Lida Group is the professional container house China and prefabricated house supplier since 1993. The main products of Lida Group contain modular house, prefabricated house, container house, temporary house, flat pack container house, large scale of labour camp, steel structure buildings, LGS Villa, and other integrated buildings, widely used in industry, traffic, city construction, commercial and other temporary accommodation.

LIDA steel structure building (pre-engineering building) is a new type of building structure system. The building structure system is formed by the main framework through linking up the H section, C section, Z section or U section steel components. Cladding system uses different kinds of panels as wall and roof together with other components such as windows and doors. LIDA Steel structure building has the advantages of wide span, high strength, light weight, low cost, temperature protection, energy saving, beautiful appearance, short construction time, good effect of insulation, long using life, space-efficient, good seismic performance, flexible layout, etc.

Lida Group’s integrated camp life supermarkets/shops are an important part of the integrated camp. The camps are generally far from the city center, and the living facilities are incomplete. The supermarkets can provide various kinds of help for people’s daily life. Supermarkets are generally independent buildings. The building area is tailored to the number of camps to meet the needs of camp personnel. The Lida Group’s integrated camp life supermarket adopts a light steel structure skeleton and uses composite panels as maintenance. According to the requirements of the camp and the local environment, the composite panels are available in EPS, fiberglass, rock wool and PU panels. After the completion of a project, the camp building can be demolished and reinstalled at another site, which is easy to install and recycles to reduce costs. Read more details at https://www.lidamodularhouse.com/.

Lida can provide large-scale farms and supporting facilities for customers. The chicken house is generally 6-15 meters wide and 30-100 meters long. The height of the flat coop is generally 2.2-2.4m, and the height of the high bed coop is about 5m. There are open type, windowed type and closed type in the chicken house, depending on the climate conditions. The exhibition hall is generally built with steel structure and glass curtain wall, simple and beautiful. This kind of structure is widely used in automobile exhibition hall and 4S shop.

With 30 years experience, Our Weifang Henglida Steel Structure Co.,Ltd. ( Lida Group) is one of the biggest prefab house manufacturer in China for the Prefabricated house TCF Camp, Flatpack Container house, Site temporary camp building, Steel Structure building and Light Gauge Steel house. Lida Group has achieved ISO9001, ISO14001, OHSAS18001 EU CE certification (EN1090). We already have good experience to work with leading construction companies, such as China state construction, China Railway, Salini Italy, Spain TR, Saudi Benladin construction, Saudi Aramco, American CAT group, and so on, we sincerely hope to work with you in the near future.

Recent Posts

Categories

Tags

April 2024
M T W T F S S
« Mar   May »
1234567
891011121314
15161718192021
22232425262728
2930  

Meta

Archives

GiottoPress by Enrique Chavez